Projects

(AWP) Advance Wastewater Treatment Plant

The latest and most effective wastewater treatment plant in the shipping industry. Project on-board crew numbers at 40 to 45. Responsible for preparation and planning of installation of AWP, continuous technical support to the assigned Manager and/or Superintendent and corresponding vessels as assigned by the Project Manager.

View Details

(AEP) Advance Exhaust Gases Cleaning Plant

Design to remove SOX from exhaust gas stream on ships Dual Water scrubber system is based on exhaust gas cleaning with seawater in open loop utilizing the natural alkalinity found in seawater. The system can also be operated using fresh water together with added alkali in a close loop mode, it is also possible to combine these two methods in a hybrid mode.

View Details

( WHR) Waste Heat Recovery Plant

Mechanical design Steam is used for AC reheating, and at the same time HT heat is dumped to sea at port. To reduce the steam and oil-fired boiler fuel consumption a new WHR system for utilizing HT heat for AC reheating was installed. One WHR heat exchanger was installed on each diesel engine.

View Details

(BWT) Ballast Water Treatment Plant

Installing of Ballast water treatment Plant (AWP): Project on-board crew numbers at 10 to 15. Responsible for preparation and planning of installation of BWT, continuous technical support to the assigned Manager

View Details